The asphalt patching inside the new curb line along Lehigh was completed on Thursday. The new curb line allows for some landscaped medians in the center of Lehigh as well as a longer and straighter right turn lane onto Glenview Road from Southbound Lehigh. We are coordinating schedules with the library work, and the new medians down the center of Lehigh should be done in the next week or two. The intersection pavement of Dewes and Washington will also be replaced later this month and may require traffic to be re-routed for several days (more details to follow).
The contractor began concrete pavement on the new Prairie cul-de-sac today. Weather pending, they plan to complete it tomorrow. After the concrete has time to cure, the area will be landscaped and then Prairie will be complete!
Friday, June 4, 2010
Friday, May 28, 2010
Curb along Lehigh
The contractor had to leave out a few sections of curb along the west side of Lehigh due to the relocation of the light poles. Now that those poles have been relocated, the contractor can complete the curb line and pour a concrete base in between the road and our new curb
Prairie Cul-de-sac
The curb has been poured around the newly redesigned cul-de-sac. The contractor is currently prepping the roadway for asphalt pavement, which (weather permitting), could be scheduled for next week.
Friday, May 21, 2010
Curb along Lehigh
The new curb was installed along the west side of Lehigh today, from Spruce to Glenview. The light poles are being relocated, so the curb will be able to be completed soon.
Excavation of the new Prairie Cul-de-sac is ongoing. We should see the curb going in next week!
Excavation of the new Prairie Cul-de-sac is ongoing. We should see the curb going in next week!
Wednesday, May 12, 2010
Punch List on Washington
The contractor was given a Punch List, which includes little items that need to be fixed since the work was completed. Residents may see workers on site starting next week making these necessary repairs.
Tentative Schedule
The contractors surveyor was on site yesterday to lay out the new curb line along Lehigh Ave. The changes to the curbline are happening on the west side of the road, starting near Spruce; the road will be widened to add space for the landscaped medians that are to be installed. Weather dependant, the contractor may begin saw-cutting the road as early as tomorrow, Thursday, May 13.
Prairie Ave is being turned into a cul-de-sac, with access from Washington Road. We anticipate this work starting in the next week or two.
All construction work is scheduled to be completed by July 2.
Prairie Ave is being turned into a cul-de-sac, with access from Washington Road. We anticipate this work starting in the next week or two.
All construction work is scheduled to be completed by July 2.
Friday, April 2, 2010
2010 Construction
We met onsite with the contractor yesterday to discuss this year’s portion of the project. Work this year will include:
• Landscape islands on Lehigh (north of Glenview Road) to slow traffic and enhance safety,
• Lengthening the right turn lane on Southbound Lehigh at Glenview Road,
• Turning Prairie into a cul-de-sac, accessible from Washington Road, to both prevent cut-through traffic and add a green area between the new Library and Jackman Park.
The Contractor is coordinating with the Library construction; the work for this project should begin in mid-May.
• Landscape islands on Lehigh (north of Glenview Road) to slow traffic and enhance safety,
• Lengthening the right turn lane on Southbound Lehigh at Glenview Road,
• Turning Prairie into a cul-de-sac, accessible from Washington Road, to both prevent cut-through traffic and add a green area between the new Library and Jackman Park.
The Contractor is coordinating with the Library construction; the work for this project should begin in mid-May.